PRESCRIPTIVE PROCESS MODEL

 PRESCRIPTIVE PROCESS MODEL

  1. Select the model which is the combination of waterfall and incremental (or iterative) models
    1. Prototyping model
    2. Agile model
    3. XP model
    4. Spiral model
  2. Team members waiting time is very less in
    1. Prototyping model
    2. Incremental model
    3. Waterfall model
  3. The success of Spiral model lies on the effective planning on Risks
    1. True
    2. False
  4. Select the CORRECT item about the Spiral model
    1. Requirements donot have any changes
    2. Requirements are complex and need evaluation to get clarity
    3. Customer is sure about the set of requirements
    4. Suits for Short term project
  5. Identify the traditional process model
    1. V model
    2. XP model
    3. Spiral model
    4. Agile model
  6. Select the type of testing done during Architecture design
    1. System Testing
    2. Acceptance Testing
    3. Unit Testing
    4. Integration Testing
  7. Select the suitable model which does the client evaluation prior before actual design starts
    1. Spiral model
    2. Waterfall model
    3. Prototyping model
    4. Incremental model
  8. Select the phase when Implementation is done
    1. Construction
    2. Modeling
    3. Deployment
    4. Communication
  9. Select the WRONG item about the Incremental model
    1. Easier to test and debug
    2. Cost lower
    3. Core product is built faster
    4. Longer time for delivery
  10. The model which is NOT flexible is
    1. Waterfall model
    2. Agile model
    3. Incremental model
    4. SCRUM

Comments

Popular posts from this blog

Musa paradisiaca - Botanical description

Datura metal - Botanical Description

CORONA VIRUS (COVID-19)